Skip to content

About this service

Installation and commissioning of diesel generator sets in Dubai, from 20 to 2,000 kVA. Covered work includes site survey and load assessment, delivery and positioning, foundation or skid mounting with anti-vibration pads, exhaust stack and silencer installation with the correct clearances, fuel tank and fuel line installation, LV cable termination, ATS and changeover panel wiring, earthing and neutral arrangement, and a commissioning run with load test and handover report. We also handle rooftop and basement installations where access, ventilation and fire requirements need to be checked before delivery. Works are coordinated with the building or facility management team and scheduled outside business hours where needed. Typical lead time is three to five working days from approved survey.