انتقل إلى المحتوى

عن هذه الخدمة

Independent condition inspection for generator sets before you buy or ship. The inspection covers a 40-point visual and mechanical check, hour meter and nameplate verification against the serial number, insulation resistance and winding check on the alternator, coolant and oil condition, fuel system and injector check, battery and charging system, control panel and protection settings, and a resistive load test where a load bank is available. You receive a written report with photographs of the nameplate, hour meter, control panel, engine and any defects found, plus a clear pass or fail recommendation. Useful for export buyers who cannot inspect the unit themselves and for dealers taking stock on consignment. Typical turnaround is two working days after access is confirmed.